Listed here below you can get a good deal of reliable ideas in regards to Installing A Bathtub.


A Step-by-Step Guide to Installing a Bathtub
Installing a bathtub isn't specifically brain surgery, yet it does need solid plumbing, woodworking, as well as in some cases, tiling abilities. Changing an old bath tub with a brand-new one is also a reasonably challenging project. If the old tub is easily accessible, the job can relocate speedily; if you have to open up a wall to eliminate the old tub and position the brand-new bath tub, the job is a lot harder. In either instance, the job is within a residence handyman's skills, although you will certainly need a helper to leave the old bathtub as well as embeded in the new one. Make sure you have actually certified on your own for the task and also fit trying it. Instead of hiring a service provider to take over a halfway-completed task, it is far better to think about using one before you begin. Opportunities are you may need a professional plumber to make tube connections.
This short article will certainly assist you install a brand-new bath tub in your shower room if you have actually already purchased a new bathtub as well as do not need to transform the setup of your previous water supply pipes.
Your devices and material list must make up the following:

 

  • New Bath tub

  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Safety Glasses

  • Level

  • Pliers

  • Adjustable Wrench

  • Putty Knife

  • Screwdriver

  • Cold Blade

  • Measuring tape

  • Pipeline Caps


  •  

Removing Old Touches


If you require to change old faucets with new ones as a part of your installment, after that the first thing you should do is separate the water system. After doing so, turn on the faucets to drain pipes any kind of water remaining in the system. The procedure of removing the existing faucets can be fairly bothersome due to the restricted accessibility that is usually the situation.
Use a container wrench (crowsfoot spanner) or a tap tool to undo the nut that attaches the supply pipelines to the faucets. Have a cloth all set for the continuing to be water that will certainly come from the pipes. Once the supply pipelines have been eliminated, utilize the very same device to loosen the nut that holds the faucets onto the bath/basin. You will certainly need to stop the single taps from turning throughout this procedure. When the taps have actually been removed, the holes in the bath/basin will need to be cleansed of any kind of old securing compound.
Prior to going on to fit the brand-new faucets, contrast the pipe connections on the old taps to the new taps. If the old taps are longer than the brand-new taps, then a shank adapter is needed for the new taps to fit.

 

 

Suitable New Touches


If the tails of the new faucets are plastic, then you will certainly need a plastic port to stop damage to the thread. One end of the port fits on the plastic tail of the tap and also the other end offers a connection to the existent supply pipes.
If you require to fit a monobloc, after that you will call for minimizing couplers, which connects the 10mm pipeline of the monobloc to the conventional 15mm supply pipeline.
Next, position the faucet in the placing hole in the bath/basin guaranteeing that the washing machines are in area in between the faucet and also the sink. Protect the tap in position with the supplier offered backnut. Once the tap is firmly in place, the supply pipes can be attached to the tails of the faucets. The faucets can either be connected by utilizing corrugated copper piping or with normal faucet connectors. The previous type ought to be linked to the tap ends initially, tightening only by hand. The supply pipelines can later on be connected to the other end. Tighten up both ends with a spanner after both ends have been connected.

 

 

Installing the Tub


Using both wooden boards under its feet, place the tub in the needed placement. The wooden boards are handy in uniformly spreading out the weight of the bath tub over the area of the boards instead of concentrating all the weight onto 4 little factors.
The following goal is to guarantee that the bathtub is leveled all round. This can be achieved by examining the spirit level and adjusting the feet on the bathtub up until the spirit level reviews level.
To set up faucets, fit all-time low of the outermost adaptable tap adapter to the proper supply pipeline by making a compression join; after that do the very same for the other faucet.
Activate the water as well as check all joints as well as brand-new pipework for leaks and also tighten them if necessary. Fill the bath tub as well as additionally inspect the overflow electrical outlet as well as the regular outlet for leaks.
Lastly, fix the bathroom paneling as defined in the maker's user's manual. Tiling and sealing around the bath tub needs to wait till the tub has actually been used at least when as this will certainly settle it right into its last position.

 

 

Getting ready for the Installation


Firstly, the supporting framework supplied with the bathroom must be fitted (if required) according to the maker's guidelines. Next, fit the faucets or mixer to the tub. When fitting the tap block, it is very important to ensure that if the faucet features a plastic washing machine, it is fitted between the bathroom and also the taps. On a plastic bath, it is also sensible to fit a supporting plate under the taps system to avoid pressure on the tub.
Fit the versatile faucet ports to the bottom of the two taps making use of 2 nuts and olives (occasionally supplied with the tub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink electrical outlet opening, and after that pass the electrical outlet with the hole in the bathroom. Make use of the nut supplied by the manufacturer to fit the plug-hole. Analyze the plug-hole outlet for an inlet on the side for the overflow pipe.
Next, fit completion of the versatile overflow pipeline to the overflow electrical outlet. After that, screw the pipeline to the overflow face which must be fitted inside the bathroom. See to it you utilize every one of the provided washing machines.
Connect the catch to the bottom of the waste electrical outlet on the bathtub by winding the thread of the waste outlet with silicone mastic or PTFE tape, and also screw on the trap to the electrical outlet. Connect the bottom of the overflow tube in a comparable manner.The bathroom ought to currently be ready to be fitted in its last placement.

 

 

Tiling Around the Tub


In the location where the bathroom satisfies the floor tile, it is necessary to secure the accompanies a silicone rubber caulking. This is necessary as the fitting can move sufficient to split a stiff seal, causing the water to pass through the wall surface in between the bath and the tiling, causing complications with dampness and feasible leakages to the ceiling below.
You can select from a variety of coloured sealers to blend in your components as well as fittings. They are offered in tubes and also cartridges, and also are capable of sealing voids up to a size of 3mm (1/8 inch). If you have a larger gap to load, you can fill it with spins of soaked newspaper or soft rope. Remember to constantly fill up the bath tub with water before sealing, to allow for the motion experienced when the bathtub is in use. The sealant can break relatively very early if you do not take into account this activity before sealing.
Additionally, ceramic coving or quadrant ceramic tiles can be used to border the bath or shower tray. Plastic strips of coving, which are easy to use and also cut to size, are also easily readily available on the marketplace. It is advisable to fit the tiles utilizing waterproof or water resistant adhesive and cement.

 

A Step-by-Step Guide to Installing a Bathtub

 

Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.


But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.


This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.

 

Remove the Existing Bathtub

 

To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.


The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.

 

Choose the Right Bathtub

 

The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.

 

Install the Plumbing and Ledger Board

 

You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.


Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.

 

Install the Bathtub

 

When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.


Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.


If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.

 

Hook up the Plumbing

 

Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.

 

Install the Bathtub Surround

 

A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.


Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.


If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.


If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


How to Install a Bathtub: Install an Acrylic Tub and Tub Surround

 

Hopefully you enjoyed our piece about How to Install a Bathtub: Install an Acrylic Tub and Tub Surround. Thanks for taking the time to read through our piece. Remember to take a moment to share this page if you liked it. Thank you for your time invested reading it.


Expertise available here.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Comments on “Plumbing Basics: A Prerequisite for Installing a Bathtub”

Leave a Reply

Gravatar